Tons
of Daily Capacity

Tons
of Daily Capacity



The total investment of LESSO Indonesia reaches about 25 million US dollars. The equipment will be put into operation in two phases within three years. In the first phase, there were eight PVC pipe production lines with an annual output of 20,000 tons, as well as three PE, PP-R and infrastructure pipe production lines with an annual output of 7,000 tons.
In the second phase, three lines of PVC pipe, and 5 lines of other products are added with an annual output of 27,000 tons and 23,000 tones respectively. In addition, there are 22 injection molding equipment for pipe fittings with annual output of 3,500 tons.

Warehouse

Extrusion Workshop

Injection Molding Workshop




Group Official Website